济南家装自流平哪家专业
发布时间:2018年04月23日
详细说明
水泥自流平施工工艺
Construction technology of self leveling of cement
1. 查看地上湿度,承认地上枯燥;查看地上平坦度,承认地上平坦;查看地上硬度,地上应无裂缝。
1. check the humidity on the ground, admit that it is dry on the ground; check the flatness on the ground and admit that it is flat on the ground; check the hardness on the ground, and there should be no cracks on the ground.
2. 彻底打扫地上, 铲除地上各种污物,如油漆,油污及涂料等等。全面打磨地上。
2. thoroughly clean the ground, remove all kinds of dirt on the ground, such as paint, oil and paint, etc. All round the ground.
3. 彻底吸净灰尘。
3. thoroughly absorb the dust.
4. 将界面剂用泡沫滚筒进行涂布,进行1:1兑水,每平米用量约为100-150克。
4., the interface agent is coated with foam drum, and 1:1 is added to the water, and the dosage is about 100-150 grams per square meter.
5. 界面剂涂布结束后,需等候1-3小时, 坚持良好通风,使其彻底枯燥。再进行自流平施工。
5. after finishing the coating, it will take 1-3 hours to maintain good ventilation and make it completely dull. Self leveling construction is carried out again.
6. 如果是汉高妥善DD商用自流平水泥(25公斤)一包应倒入盛有6公斤清洁凉水的拌和桶内,如果是汉高妥善DX超强自流平(25公斤)一包应倒入盛有6.5公斤清洁凉水的拌和桶内,用带浆电钻进行拌和,直至构成流态均匀的混合物。有必要保证无结块。然后迅速的将混合物均匀倒入施工区域,用耙子将自流均匀布,并用滚筒进行滚拉,将空气释放。注意要合理安排施工人员,保证在15分钟内将混合好的一包自流平水泥施工完。完结2毫米厚度,每包可涂布约8平米。
6. if a package of DD commercial self leveling cement (25 kilograms) should be poured into the mixing bucket with 6 kilograms of clean water, a bag should be poured into a mixture of 6.5 kilograms of clean and cool water in a mixture of 6.5 kilograms of clean and cool water in Han Gao and a DX super strong self leveling (25 kg). It is necessary to guarantee no caking. Then the mixture is quickly poured into the construction area, and the rake is evenly distributed by the rake. The air is released by rolling with the roller. Attention should be paid to the reasonable arrangement of the construction personnel to ensure that the mixed bags of se
济南笨鸟先飞地面找平
联系人:腾师傅 先生 (总经理)
电 话:0531-58969192
传 真:0531-58969192
手 机:13688634565
地 址:中国山东济南市济南市各地均可服务
邮 编:250000
网 址:
http://bnxfzlp.qy6.com.cn(
加入收藏)